For metal and polymer additive manufacturing facilities

All your metal and polymer additive manufacture waste, fully managed

Spent powder, failed builds, filters, swarf, plates and the drums nobody wants. We classify every stream, supply the containers if required, collect on your schedule and hand back the completed paperwork. The material we recover is valued and a percentage returned to you — paid out, or credited against your next collection.

Ongoing management or a single collection when you need one. So your team can get back to building.

Four details, and we will call you back. We aim to respond in 1 hour.

Book a call, or ask for a quote

Required information

Required if you want us to call.

Required if you want a written quote.

That is everything we need. Everything below just makes the first call more useful.

Optional information

This helps us get you a better quote, quicker. But is not required if you'd prefer to discuss on a call.

When would suit?

The first part is enough — M15 is fine.

What needs collecting?

Click a suggestion or type your own.

A photo of the drum or the label often answers more than a paragraph.

We aim to respond in 1 hour. We will not pass your details to anyone else.

Every stream your additive manufacturing facility produces

One collection, one carrier, one set of paperwork. Nothing moves until its classification and transport category are established in writing.

  • Spent and part-life powder
  • Unused and out-of-spec powder
  • Sieve oversize and fines
  • Build plates
  • Machining swarf and chips
  • Supports and failed builds
  • Filter media and condensate
  • Wet separator sludge and vacuum waste
  • Mixed or unidentified material

We take every material type and grade, listed or not — Ti‑6Al‑4V, IN718, IN625, 316L, 17‑4PH, AlSi10Mg, CoCr, maraging and tool steels, copper alloys, PLA, ABS, nylons, and whatever else comes off the machine.

Everything else

How does a collection work?

Four steps, and only the first is yours. Tell us what you have — alloy, format, rough quantity, postcode. We classify each stream against the List of Waste and WM3 guidance and establish its transport category in writing, whether or not you go ahead. We supply the containers if needed and collect around your production schedule. You get the documentation back, with a recovery statement and the pre-agreed percentage value of what we recovered.

What does it cost, and how does the recovered value come back?

Collection is charged. The metal we recover is valued and the agreed percentage of the value returned to you — paid out, or credited against your next collection, whichever suits. On an ongoing account the recoverable streams progressively offset the ones that carry a disposal charge (filters and residues mainly). We do not publish a rate card: price depends on alloy, format, contamination and distance. But we provide a transparent breakdown of what we are able to recover.

Why would one supplier cost less than the three we use now?

Most additive manufacturing sites split powder, solid scrap and filters across a hazardous waste contractor, a scrap merchant and a machine OEM. Three sets of paperwork, three collection windows, three places the audit trail can break. One collection and one record removes the duplication. And because nickel, cobalt, titanium and chromium hold value even as spent powder, swarf and filter loadings, the recoverable material works against the cost of removing the rest.

What regulations apply to this material?

Five regimes apply to the same drum at once: waste classification, duty of care, dangerous goods carriage under ADR, site permitting, and occupational health and safety. None satisfies the others — a drum can lawfully be non-hazardous waste and Packing Group I dangerous goods at the same time. That is where most of the risk sits. General waste contractors will not take reactive metal powder, and scrap merchants are not set up for waste that needs consigning. We are built for the overlap.

Is spent additive manufacture powder hazardous waste?

Not necessarily. The natural List of Waste codes for metal dust and particles are absolute non-hazardous entries, so hazard assessment cannot change them. Filters and clean-out residues fall to a mirror pair where the metal loading is assessed, and for nickel and cobalt loadings a hazardous classification is realistic. Separately, the same material can still be Packing Group I dangerous goods for transport. We assess rather than assume.

What are the environmental benefits?

Recovered metal displaces primary production, and making titanium, nickel and cobalt from ore is among the most energy-intensive industrial processes there is. Material that goes to recovery does not go to landfill or incineration. What we will not tell you is that every kilogram is recycled, or that the service is zero waste. But the more we can recover and recycle the better. You get a recovery statement per consignment, which is a figure you can use in your own reporting.

Can you manage this on an ongoing basis?

Yes, and it is what most sites settle on. Scheduled collections across every stream, one account, one set of records, and a recovery statement each time. You stop tracking drums, chasing consignment notes and storing material you cannot move. One-off collections are equally welcome — a decommissioning, a clearance or a single batch needs no commitment.

Do you work with sites our size?

We serve anyone from universities with two machines and a cupboard of legacy drums to production facilities with dozens of machines and auditors who will ask exactly where material went.

Do you take titanium powder?

Yes. Titanium is one of the streams the service was built around, and the one general waste contractors most often decline. Tell us the alloy, format and condition and we will tell you what handling it needs.

What do we need to do before a collection?

Tell us what you have: alloy, format, approximate quantity, and whether the material has been passivated or wetted. If you do not know, say so — working it out is part of the assessment. We can supply containers if required.

Do we need a consignment note?

It depends how the stream classifies. Hazardous waste requires a consignment note and we produce it. Non-hazardous takes an ordinary waste transfer note. Either way the paperwork is ours to prepare and yours to keep — three years for hazardous, two for non-hazardous.

Can you take our filters?

Yes, and they are usually the stream customers most want gone. They are also the most likely to classify as hazardous, so they need assessing.

Do you cover our site?

We collect across the United Kingdom.

What if we do not know what is in the drum?

A normal enquiry, not an awkward one. Decommissioned machines, inherited stores and unlabelled legacy drums are part of the job. Do not open it, do not decant it, and do not move it until it has been assessed.

Can you handle a machine decommissioning or a full store clearance?

Yes. Tell us how many machines, which alloys ran through them, and how long the material has been sitting. Those three answers determine most of the plan.